Architecture & Urban Environment

A Pretty Façade Doesn’t Make a Business

Maxim Shabashov

13 min read
Photo: Pexels | Dextar Studio ™

Part One. What happens to a shopping or business centre long before its façade takes shape, and why the decisions made at this stage will determine whether it generates income for twenty years or becomes an expensive showpiece.

Two Buildings on the Same Street 

Imagine two new buildings on the same street. Both look impressive: glass, lighting and architectural renderings that warm an investor’s heart. Both open with ribbon-cutting ceremonies, balloons and speeches about becoming “the city’s new attraction”.

Three years pass.

The first building has no vacant units. Tenants are queuing up, rents are rising, and the property is increasing in value. It can be sold, used as collateral or refinanced. In the second, half the shopfronts are covered with “To Let” signs. OLX is full of listings reading “Commercial premises for rent, owner, price negotiable”, while the property manager explains to the owner that “that’s just how the market is right now”.

From the outside, the two buildings are almost indistinguishable. The difference lies within. And it is established not during construction, not at the opening, and not even at the design stage, but much earlier, during that brief, seemingly unremarkable period when the owner has nothing but an idea, a plot of land and money.

That is the period this article is about.

Cultural Master Planning as a Tool for Territorial DevelopmentCultural master planning is becoming part of the toolkit for urban development and real estate, linking the identity of a place, spatial solutions, cultural programming, community participation and the economic model at the stage when a project concept is being shaped.mag.humodoc.comCultural Master Planning as a Tool for Territorial Development

The Era When Everything Worked 

Let’s be honest. For a long time, our markets operated according to a very simple formula: “We have the resources, so we build.”

There was a plot of land, there was capital, and there was the confidence that “people need it”. The architect designed something beautiful, the builder built it, and then tenants arrived of their own accord because they had few other places to go. The market forgave everything: inconvenient layouts, blind spots, confusing floor arrangements, a lack of parking and baffling decisions such as a food court that required a journey akin to climbing a mountain to reach it.

It was a market with little competition. Almost anything that was built could be sold or let. Expertise seemed like a luxury, while “we’ll work it out ourselves” sounded like common sense.

The problem is that such markets do not last forever. Tashkent and Uzbekistan are now going through the same transition that other cities experienced earlier: the number of properties is growing, people have more choice, and tenants are beginning to compare locations, calculate footfall and turnover, and move to places that serve them better. At that point, the old formula stops working. Not gradually, but rather abruptly. Yesterday, a property was “full of promise”. Today, it is “a difficult asset”.

The good news is that this journey has already been made elsewhere. We have seen how it unfolds and, to be frank, we have made almost every mistake possible along the way ourselves. There is no need to repeat them.

Photo: unsplash.com | Vanja Milicic

Two Pyramids

The difference is easiest to explain using two pyramids.

In the first, the complete development process, every layer supports the next. At the bottom is the starting point: an understanding of what we are building and why. The strategy and a measurable objective rest on that foundation. Next comes the commercial concept, followed by the operational concept, the technical brief, design, construction, acceptance and opening. No layer hangs in mid-air.

The second pyramid looks the same from the outside. But look behind the façade and, instead of a clear starting point, you find “we have the resources, so we build”. Strategy becomes wishful thinking, the concept becomes a collection of pictures, there is no operational model, and the technical brief is written as construction progresses. Everything rests on faith, taste and renderings. Until the first serious competitor arrives.

The most troubling thing about the second pyramid is that its weaknesses are invisible during construction. They emerge later, when fixing them costs many times more. That is why the central argument of this article may sound dull, but it has been proven in money: a proper development process costs a fraction of the budget. Going without one can cost many times more.

A Project Does Not Begin With a FaçadeYou can build a beautiful house and lose money. You can buy expensive land and underestimate its potential. You can increase the number of square metres while simultaneously reducing their value. In development, success is not determined by how impressive a building looks, but by how precisely the entire journey from land to buyer has been mapped out. Lyubov Safronova proposes taking that journey in 20 steps, from site analysis and identifying a market niche to architecture, branding and sales.mag.humodoc.comA Project Does Not Begin With a Façade

The Starting Point, or an Honest Conversation with Yourself

Every project begins neither with the architect nor with the plot of land. It begins with a question that may seem unnecessary: what, exactly, do you want from this property?

This is not a philosophical exercise. An owner may have very different objectives: to generate a stable income for twenty years, to build and sell at a profit, to preserve capital, to create a “property for the city” or to leave something to their children. Each objective leads to a different kind of property. Someone planning to sell after three years will make different decisions from someone intending to own the building for twenty years. Those differences affect virtually every stage, from the quality of the engineering systems to the tenant mix.

If there are several owners, things become even more interesting. One wants a quick exit, another wants dividends, and a third wants “something beautiful”. As long as the project exists only in conversation, this causes no problems. Once money starts being spent, conflicting objectives turn into a source of tension, usually surfacing at the worst possible moment. It is far better to identify those differences before the project begins than to discover them at a board meeting halfway through construction.

The next step is to translate the personal objective into a clear business outcome: what exactly are we creating, for whom, and what income should it generate? Then comes a sober assessment of the situation as it stands: the land, the money, the team, the connections and the constraints. And an honest assessment of whether we understand the entire journey, rather than just its first and most appealing stage.

There is another question that is rarely asked aloud: does the project have access to people who have actually managed and operated similar properties in competitive markets? Not people who have merely “been around”, nor a well-connected acquaintance who has “built something too”, but people who know what happens to a property after it opens. The most expensive phrase in real estate development is “we’ll work it out ourselves”. The cost of that confidence usually becomes clear about a year after opening.

Photo: Pexels | mxkrv

The Horizon: Building for a Market That Does Not Yet Exist

There is a simple calculation that is constantly overlooked. Several years pass between the initial idea and opening. That means the property will enter a market that exists three or four years from now, not the one that exists today. And it will need to operate for another ten, fifteen or twenty years after that.

Everything that seems fashionable today may be commonplace by opening day and outdated by the fifth year of operation. Competitors who do not exist today may already be established by the time the building opens. The audience will grow, move and change its habits. Shopping centres originally designed as places for “shops only” are now desperately searching for space for restaurants, fitness facilities, children’s areas and services. These are the things that give people a reason to return regularly rather than visit once a season.

A good property, therefore, should not be designed as a monument to a particular moment, but as a system capable of changing: adapting layouts to new operators, adjusting the proportions of different functions and accommodating formats that do not yet exist. If a building cannot be transformed, its owner may face just two options a few years down the line: expensive reconstruction or a slow decline.

The First Kurultai of Kazakhstan’s Builders and a New Logic for DevelopmentWe have grown accustomed to thinking that the development industry changes when new technologies, materials, building regulations or financial instruments emerge. In reality, genuine transformation begins even earlier, when industry professionals arrive at a new answer to the fundamental question: What are people actually buying from me today?mag.humodoc.comThe First Kurultai of Kazakhstan’s Builders and a New Logic for Development

Strategy: Set the Limits Before You Start Dreaming

Once the starting point has been established, the project reaches the stage where dreams meet reality. And reality has an unpleasant habit of winning.

First come the constraints imposed by the site: its area, permitted height, development density, access roads, entrances, parking requirements and urban planning restrictions. These determine the maximum volume that can actually be built. You can dream all you like about a food hall, cinema, thermal baths and a rooftop hotel, but if the site allows for 20,000 square metres rather than 80,000, the conversation will be very different. It is better to discover that before the architect draws something that cannot be approved.

Second come the gaps in the market. It is important not to confuse what is “popular” with what is “needed”. Almost anything can be popular: another shopping centre with the same brands, another Class A business centre, another food court. What matters is something else: what people in the property's catchment area are missing. Where are the gaps in retail, offices, hotels, leisure, dining, sport, healthcare and social infrastructure? A property that meets a genuine unmet need can attract an audience almost for free. One that simply duplicates its neighbour ends up fighting a war over rental rates.

Third comes the basic concept. This is not yet a fully developed concept, but the first tangible outline: the functions the property will contain, their proportions, what takes priority and what plays a supporting role. Its purpose is not to win people over, but to formulate hypotheses that can subsequently be tested. A basic concept is not an answer. It is a list of the right questions.

SMART: Everyone Knows It, Almost No One Does the Maths

Now for the interesting part. There is probably no word in business that is used more often and put into practice less frequently than SMART.

Everyone knows what it stands for: specific, measurable, achievable, relevant and time-bound. Many can even write the acronym on a whiteboard. Yet in real estate development, a typical “SMART objective” sounds something like this: “to build a modern multifunctional complex that will be in demand by the market in 2028”. Specific? Not really. Measurable? By what measure? Achievable? Who has checked? But it sounds impressive and includes a year.

A genuine objective does not emerge before the calculations, but after them. And those calculations are decidedly down to earth.

First, establish how many square metres in the property will actually generate income. Not the total floor area that looks so good in a presentation, but the space someone will pay to use. The difference can be uncomfortably large: corridors, staircases, technical rooms and attractive atriums do not pay rent.

Next comes income. Rental rates should be based on actual transactions, not price lists or wishful thinking. “I’m asking $40 per square metre” and a deal at $40 per square metre are two different things, and the latter happens considerably less often than the former. Realistic occupancy rates must also be factored in, rather than the dream of reaching 100 per cent occupancy from day one.

Then come the costs. The cost of creating the property should be calculated by function, not reduced to a single figure per square metre. A cinema, a restaurant and an office floor have very different costs. The cost of running the property must be calculated separately, including operations, taxes, staffing and repairs. A building that is cheap to construct but expensive to maintain is a classic trap, one that developers fall into with remarkable regularity.

Only then do the figures emerge that allow the owner to make an informed business decision: yield, property value, payback period and financing requirements. Now the objective can finally be formulated, with every letter of SMART backed by a number.

Photo: Pexels | mxkrv

Thresholds, Deadlines and the People Who Can Stop Everything

A figure without a threshold is merely an observation. Every key indicator therefore needs a clear “go/no-go” threshold and someone responsible for it. If market rents fall below the required level, if construction costs exceed the limit, or if occupancy fails to reach the required level, what happens next? The decision must be made in advance, not in a panic.

Deadlines should be determined not by the desired opening date, but by the longest link in the chain: approvals, design, equipment delivery or negotiations with major tenants. A reassuring date such as “opening by New Year” usually means someone has failed to account for the longest lead time.

Risks should be documented not for the sake of a report, but to identify where contingency reserves are needed and where to set a decision point: the moment after which the project can proceed only if certain conditions have been met.

And finally, people. Neither the objective nor the calculations will work until they have been accepted by those who pay, those who grant permission and those who will work in the property: partners, the bank, the authorities and the future team. Projects are far more often stopped not because the arithmetic is wrong, but because someone important learns about the figures too late.

The Threshold Beyond Which the Real Work Begins 

By this point, the owner has a great deal in place: a clear personal objective and business goal, an understanding of the site's constraints, a map of market gaps, a basic concept built around hypotheses, measurable targets, decision thresholds, deadlines, risks and the people who have agreed to the plan.

Surely it is time to call in the architect? No.

One crucial question remains unanswered: who is this property for, and why will people come back regularly rather than visit just once, on opening day, to collect a free balloon? Who are these people? Where do they live and work? Which aspects of their daily lives are not being catered for today? Which operators are ready to meet those needs, and on what terms?

The answer is the commercial concept. It is the key layer of the entire pyramid, determining income, tenants and, surprisingly enough, architecture. The architect should not design a building and then leave the developer to search for tenants to fit it. The audience and the tenants should determine what the building needs to be.

That is the subject of the next article.

Newsletter

A letter from the HD editors

Once a week, we send the best stories, events, and cultural discoveries from Central Asia.